长江三峡水坝下游河道悬沙恢复和床沙补给机制 |
||||||||||||||
杨云平, 张明进, 李义天, 张为, 由星莹, 朱玲玲, 王冬 | ||||||||||||||
Suspended sediment recovery and bedsand compensation mechanism affected by the Three Gorges Project |
||||||||||||||
Yunping YANG, Mingjin ZHANG, Yitian LI, Wei ZHANG, Xingying YOU, Lingling ZHU, Dong WANG | ||||||||||||||
表3 2008-2013年宜昌至大通河段疏浚量[ |
||||||||||||||
Tab. 3 Dredging amounts in the Yichang-Datong section during 2008-2013 | ||||||||||||||
|
||||||||||||||