三峡水库175 m蓄水后库尾河段减淤调度控制指标研究 |
朱玲玲, 葛华, 董炳江, 杨成刚 |
Control index of sediment reduction dispatching in Chongqing reach after the storage level of TGR reaching 175 m |
ZHU Lingling, GE Hua, DONG Bingjiang, YANG Chenggang |
图8 一维模型计算消落期河段流速及水深 |
Fig. 8 Flow rate and water level during the drawdown period of TGR calculated by one-dimensional model |
![]() |