三峡水库175 m蓄水后库尾河段减淤调度控制指标研究
朱玲玲, 葛华, 董炳江, 杨成刚

Control index of sediment reduction dispatching in Chongqing reach after the storage level of TGR reaching 175 m
ZHU Lingling, GE Hua, DONG Bingjiang, YANG Chenggang
图10 三峡水库消落期重庆主城区河段冲淤量与来流及坝前水位日均降幅的相关关系
Fig. 10 Relationship between the amount of erosion and deposition in Chongqing reach and the inflow in front of TGD (a) and relationship between the amount of erosion and deposition and the daily average drawdown of water level (b)