1986-2015年小浪底水库运行前后黄河下游主槽调整规律 |
王彦君,吴保生,申冠卿 |
Adjustment in the main-channel geometry of the lower Yellow River before and after the operation of the Xiaolangdi Reservoir from 1986 to 2015 |
WANG Yanjun,WU Baosheng,SHEN Guanqing |
图5 1986-1999年不同河段主槽河宽变化过程 |
Fig. 5 Changes in main-channel width in different reaches from 1986 to 1999 |
![]() |