1986-2015年小浪底水库运行前后黄河下游主槽调整规律 |
王彦君,吴保生,申冠卿 |
Adjustment in the main-channel geometry of the lower Yellow River before and after the operation of the Xiaolangdi Reservoir from 1986 to 2015 |
WANG Yanjun,WU Baosheng,SHEN Guanqing |
图4 不同河段主槽单位河长累计冲淤过程 |
Fig. 4 Main-channel cumulative erosion and sedimentation per unit river length in different reaches |
![]() |