1986-2015年小浪底水库运行前后黄河下游主槽调整规律 |
| 王彦君,吴保生,申冠卿 |
|
Adjustment in the main-channel geometry of the lower Yellow River before and after the operation of the Xiaolangdi Reservoir from 1986 to 2015 |
| WANG Yanjun,WU Baosheng,SHEN Guanqing |
| 图3 黄河下游的来水来沙条件变化过程 |
| Fig. 3 Temporal changes in water and sediment conditions in the lower Yellow River |
|