1986-2015年小浪底水库运行前后黄河下游主槽调整规律 |
王彦君,吴保生,申冠卿 |
Adjustment in the main-channel geometry of the lower Yellow River before and after the operation of the Xiaolangdi Reservoir from 1986 to 2015 |
WANG Yanjun,WU Baosheng,SHEN Guanqing |
图13 黄河下游主槽河相系数与当年水沙条件之间的关系 |
Fig. 13 Relationships between the main channel cross-sectional geomorphic coef?cient and the flow and sediment conditions of the lower Yellow River |
![]() |