1986-2015年小浪底水库运行前后黄河下游主槽调整规律
|
王彦君,吴保生,申冠卿
|
Adjustment in the main-channel geometry of the lower Yellow River before and after the operation of the Xiaolangdi Reservoir from 1986 to 2015
|
WANG Yanjun,WU Baosheng,SHEN Guanqing
|
|
表2 小浪底水库运行前后不同时期主槽断面形态变量统计值
|
Tab. 2 Statistical parameters of the main-channel cross-sectional geometry before and after the operationof the Xiaolangdi Reservoir
|
|
时段 | 断面形态变量 | 小花段 | 花夹段 | 夹高段 | 高孙段 | 孙艾段 | 艾泺段 | 泺利段 | 1986-1999年 | | 0.75 | 0.56 | 0.55 | 0.76 | 0.82 | 0.87 | 0.88 | | 1.03 | 0.98 | 0.92 | 0.72 | 0.73 | 0.78 | 0.74 | | 0.73 | 0.57 | 0.60 | 1.06 | 1.13 | 1.12 | 1.19 | | -0.25* | -0.44* | -0.45* | -0.24 | -0.18 | -0.13 | -0.12 | | 0.03 | -0.02 | -0.08 | -0.28* | -0.27* | -0.22* | -0.26* | 2000-2015年 | | 1.21 | 1.40 | 1.24 | 1.07 | 1.06 | 1.02 | 1.03 | | 2.57 | 2.34 | 2.15 | 2.20 | 1.77 | 1.59 | 1.71 | | 0.47 | 0.60 | 0.58 | 0.49 | 0.60 | 0.64 | 0.60 | | 0.21 | 0.40 | 0.24 | 0.07 | 0.06 | 0.02 | 0.03 | | 1.57* | 1.34* | 1.15* | 1.20* | 0.77* | 0.59* | 0.71* |
|
|
|